Proposed Ship Channel Bridge
Program Limits
South of SH 225 to north of Jacintoport Blvd./UPRR
Program Length
4.1 miles
Program Limits: South of SH 225 to North of Jacintoport Blvd./UPRR
Program Length: 4.1 miles
Program Start Date: March 2018
Timeline: The southbound bridge is expected to open to traffic in early 2025. The northbound bridge is expected to open early 2028, completing the program.
Improvements for Drivers:
- The program will include shoulders on both sides for stalled vehicles, emergency vehicles, and clearing accidents
- The bridges will have four 12 ft. lanes in each direction of traffic, increasing capacity for future traffic demands
- Approaches are designed to be less steep and to increase visibility for drivers
- Higher speed limit than the current posted speed
- The proposed bridges will remove piers from the water which will improve vessel navigation through the channel
Program Location Map
Legend
Program Limits